*PROJECT
What We Did
A comprehensive site survey was conducted alongside a boundary identification to clearly define the extents of The Glen Reserve and Rotary Park in preparation for upcoming redesign and upgrade works.
The project utilized a combination of UAV drone mapping, data modelling, cadastral surveys, and detailed field surveying onsite.
Surface modelling enabled a thorough analysis of the terrain, while the field team located key infrastructure including sewer and water services, culverts, buildings, and onsite benchmarks. All data was compiled into a detailed package to support the needs of design and construction teams across multiple disciplines.








